Jtec
Jurgen Toischer engineering consulting 
jTi
1986-2007
reEnergySystem
All rights reserved

*)  to Client licensed uses with such Systems pure Gases only
 

#
Product
Mass/kg
 cESy12  compact-EnergySystem -12kW/3S4pV -12kVA [testEvaluations] *
173
 S4pV  4x1kVA solar-photoVoltaic roof parts module [~4m x 7.8m]
687
 Test-cGS  GasStor -0.2MWh testSys -31MPa DOT-E type vessels or similar
961
 cGS1  compact GasStorage 2+1 PV9 's [2Hydrogen and 1Oxygen 9.9l tank]*
21.3
 2cGS1u  2 compact GasStorage banks 2 [Hydrogen and Oxygen] groups *
45
 +cGS1u  Additional c'GasStor +1 PV9-bank each to extend 2cGS1u *
22
 2cGS1m  2bank c'GS1m to cESy [<12kVA uses] each module uses 4 PV9's *
173
 +cGS1m  Additional c'GasStorage +1 cGS1m bank each to 2cGS1m *
86
 +2b2so  Additional small autoCascading 2bank Outlet from 2GS_m [<12kVA]*
1.3
 ++b2so  Additional autoCascad-Bank(s /2+) to +2b2so [as /per +cGS_ bank]*
0.4
 +2b2si  Spare/aCascad2bank In-let to 2GS_m [additional inlet for redundance]*
1.2
 ++b2si  Spare/Cascade-Bank(s /2+), to +2b2si [additional bank(s) per +2b2si]*
0.4
 eEs12  electric 12 kW fuelCell Generator in rV19s12 [eES/cESy expandable]*
80
 +eEs12  +12kW eEs extension /s19”3h to expand eES12 to eEs24.. *
49
 gES4  gasSupply -4kW incl. rV19s12 [gES8-16 or -cESy12 expandable] *
71
 +gES4  gESy4 electolyzer extension +4kW/gES4 expands gES4 to gES8... *
23
 2GS1m  2bank GS1 with 2groups of 4PV9's[2H2+O2] to ~48kVA uses each *
178
 +GS1m  Additional +1bank 4 PV9's GasStorage(s) each to 2GS1m basis *
88
 2GS4m  2bank GS4 with 2groups of 4x4PV9's [2H2+O2 each] to ~<0.2MW *
683
 +GS4m  Additional +1bank 4x4 PV9's GasStorage(s) each to 2GS4m basis *
341
 +2b4so  Additional autoCascad 2bankOutlet from 2GS_m [ea./eES48 max.]*
3.1
 ++b4so  Additional autoCascad-Bank(s /2+) to +2b4so [as per +GS_ bank]*
1.1
 +2b4si  Additional autoCascad2bank In-let to 2GS4m [-2 gES24 max.<.1MW]*
2.8
 ++b4si  Additional autoCascad-Bank(s /2+), to +2b4si [as per +GS4m bank]*
1.0
 FTESO  flexible quickConnect autoFiller cascade's Hydrogen+Oxygen *
12
 FTESI  in-put connectPort to refill/mobil port to refill/GS +returnWater *
8
 rV19s12  Short 19” 12h rackVault 1door chassis for cESy, gES and eES
14
 Htt2  Hermetic thermo-transfer /rV19_  external/internal cooling unit
6
 nAc12h  inertNitrox mHVAC/rV19”12h [for hermetic rV19s12 Ex-safety]*
10
 pS2a40  Pressure Sensor uF2-40/Soi-link  digital Oxygen or Hydrogen version *
0.1
 p2D  Pressure 2 Soi-port Data display digital in MPa [N/mm²]std or %'s *
0.2
 cSoi2  Control System to fibreOptic-2io  remote energyActivation peripheral *
0.4
 RoWSy2  pureWater product plant -gES8  2h-fits in 19s12  [solar-pV powers]*
17

solar photo-voltaic ESy


Contact News About
SCUBA CAM ESy jTi